Mechdeck vs plinth vs sleeper base: what shopping-centre HVAC really needs
Three ways to sit an AHU on a roof — and only one of them survives a tenancy fit-out five years in. Here's how to pick.
Read guide →Plainspoken guides for the people who spec, quote and build rooftop mechanical platforms in Australia and New Zealand.
Three ways to sit an AHU on a roof — and only one of them survives a tenancy fit-out five years in. Here's how to pick.
Read guide →Nine boxes every rooftop mechanical platform has to tick before the sparky gets on the roof. Print it, tape it to the tender pack.
Read guide →Undersize it and the sparky can't reach the coil. Oversize it and you've quoted 40% more steel than you needed. Here's the pattern that works.
Read guide →The three things WorkSafe inspectors always check on rooftop plant — and the two most mechanical consultants forget until handover.
Read guide →The spec-sheet skeleton we've watched senior mechanical consultants copy-paste into tender packs for five years running.
Read guide →