Alti Access Australia

#331 Summerset Aged Care

Prepared by Alti Access Australia

For APM · Dominic Taverniti · Chirnside Park Vic

45%

Platform Specification

Platform footprintCustom polygon — 8 vertices
Deck area127.90 m²
Perimeter48,600 mm
Roof pitch0°
Platform start height100 mm
Load rating2.5 kPa (250 kg/m² spread load)
Load basisUniformly distributed load per square metre. Point loads are not assessed and require specific engineering review.
Roof typeConcrete
Screen / wall finishMill Finish
Edge treatmentStandard Louvre Wall
Standard louvre wall height2,000 mm · 100 mm panel thickness

HVAC Equipment

LabelShapeColourPosition (X, Z)W × L × H (m)Weight (kg)
Hot Water Unit PlantBoxBlue-0.70, 5.255.90 × 2.60 × 1.803,000
AC Unit 1BoxCharcoal1.70, 3.401.00 × 0.50 × 0.70100
AC Unit 2BoxCharcoal0.50, 3.401.00 × 0.50 × 0.70100
AC Unit 3BoxCharcoal-0.70, 3.401.00 × 0.50 × 0.70100
AC Unit 4BoxCharcoal-1.90, 3.401.00 × 0.50 × 0.70100
Other Unit 1BoxWhite3.30, 1.000.75 × 2.20 × 0.70100
Other Unit 2BoxWhite3.30, 3.400.75 × 2.20 × 0.70100
Other Unit 3BoxWhite3.30, 5.200.75 × 1.10 × 0.70100
Other Unit 4BoxWhite3.30, 6.400.75 × 1.10 × 0.70100
Other Unit 5BoxWhite-3.20, -1.500.75 × 1.10 × 0.70100
Other Unit 6BoxWhite-3.20, -5.800.75 × 1.10 × 0.70100
AC Unit 5BoxCharcoal-1.70, -4.101.00 × 0.50 × 0.70100
AC Unit 6BoxCharcoal-1.70, -2.801.00 × 0.50 × 0.70100
Total operating weight4,200 kg

Load analysis

Deck load rating2.5 kPa (250 kg/m²)
Deck area127.90 m²
Total deck capacity31,975 kg
HVAC total weight4,200 kg
Average spread load33 kg/m²
Capacity utilisation13% — within capacity

Uniformly distributed (spread) load basis — 2.5 kPa = 250 kg/m², 5.0 kPa = 500 kg/m². Point loads and concentrated feet/skid reactions are not covered and require specific engineering review.

Prepared by Alti Access Australia — powered by Fair Dinkum Mechdecks